CM15 · A12 J12 · 22 mi from central London · Kitchen Extensions
Kitchen Extension Luxury Vinyl Flooring (LVT & SPC) — Shenfield, CM15
Kitchen-extension Luxury Vinyl Flooring (LVT & SPC) in a Shenfield home is a level-matching, batch-matching and UFH-commissioning job before it's a board-fitting job. We plan all three before ordering material — because you can't unfit a 40mm board mismatch after the fact.

Making the extension read as one floor with the existing kitchen
On Shenfield kitchen extensions we specify the whole floor — extension plus retained kitchen — as one order, from one batch. Trying to match into a 5-year-old kitchen board never works; the new boards read fresh, the old ones read weathered. Better answer: re-do both, so they're the same age from Day 1.
Local context
Elizabeth Line eastern terminus — major property uplift since 2022
Nearest station
Shenfield (Elizabeth Line)
Getting the height transition right in Shenfield rear extensions
Where the two levels genuinely can't be matched (rare, but real), we design a two-step visual transition with a matched threshold ramp — never a 'hope no-one notices' butt-join.
Why Shenfield clients book us for kitchen extensions
- Batch-matched supply across extension and retained kitchen
- Silicone-sealed wet-zone perimeter on every Shenfield extension
- Batch-matched supply across extension and retained kitchen
- Silicone-sealed wet-zone perimeter on every Shenfield extension
UFH commissioning for Shenfield kitchen extensions
Build-up on Shenfield extension UFH floors: max 20mm total. Board 14–15mm, thermal underlay 4–5mm. Anything thicker slows response and costs energy.
Kitchen Extensions in Shenfield — questions
- Can I blend a new extension floor into my existing Shenfield kitchen?
- Yes — but the winning strategy is to re-do both floors together, from one batch. Trying to match into an existing floor almost always shows the join. Costs more but reads seamless.
- Should the extension floor match the kitchen or the lounge in Shenfield?
- In Shenfield open-plan extensions the floor should match both — one continuous run through kitchen, dining and living. Zoning by flooring change is out of fashion and never re-sells well.
- Can the floor go in before the Shenfield extension kitchen is fitted?
- Ideal sequencing: floor first, kitchen second. Puts the floor under the kitchen (better resale, better waterproofing) and avoids kitchen plinth transitions. We work this way on 70% of Shenfield extensions.
- What warranty covers a Shenfield kitchen extension floor?
- 10-year workmanship + manufacturer wear warranty (20-year residential typical). We retain UFH commissioning records for manufacturer warranty compliance on every Shenfield extension.
- How long after the extension is finished can I fit the floor in Shenfield?
- New screed needs 1 week per centimetre to dry — a 75mm slab needs 7–10 weeks before flooring is safe. Dehumidification can accelerate; guessing cannot. We CM-test on every Shenfield extension fit.
- How long does a full Shenfield kitchen extension floor take to fit?
- 5–7 working days for a typical Shenfield rear extension (18–25m²) plus retained kitchen, including UFH commissioning, subfloor levelling and silicone perimeter.
Book a Shenfield kitchen extension flooring survey
Levels matched, UFH verified, batch planned, silicone sealed.
Every Shenfield kitchen extension floor we quote is planned as a single continuous surface — because that's what the finished room asks the floor to be.