£150 OFFthis month —Claim now →
SUPPLY & FIT · LONDON · SUSSEX · SURREY

AL2 · A5183 / M25 J21a · 21 mi from central London · Shared Houses & HMOs

Park Street Shared-House Engineered Wood Flooring: Landlord Fit

HMOs in Park Street put the hardest residential wear pattern on a floor of any category — multiple tenants, multiple visitors, mismatched routines, no shared care for the fabric of the building. On Park Street HMO jobs we spec Engineered Wood Flooring to commercial-grade Class 33 wear, sealed edges throughout, and Class B fire-rated where the AL2 licence demands.

Multi-let flooring in a Park Street HMO, AL2

Meeting Park Street HMO licence conditions on flooring

For period Park Street HMOs with escape-route corridors we sometimes step up to Class Bfl-s1 rated flooring — higher spec, small price increase, generous margin above the licence minimum.

Why Park Street clients book us for shared houses & hmos

  • Portfolio pricing from 3+ Park Street HMO properties
  • Fire-rating certificate included in every HMO quote pack
  • Portfolio pricing from 3+ Park Street HMO properties
  • Fire-rating certificate included in every HMO quote pack

The commercial spec that suits Park Street HMO living

HMO wear is 2–4× residential — concentrated in the hallway, kitchen and shared living space. We spec Class 33 (commercial-grade) LVT with 6mm+ wear layer for Park Street HMOs by default. Survives 5+ years of shared-house use without visible degradation.

Local context

Conservation village around the river Ver

Nearest station

Park Street

Turnover speed on Park Street HMO fits

Between-tenant single-room turnovers are possible in 1 day — strip, fit, clean, re-let. Common on Park Street HMO room turnovers where the shared spaces stay intact.

Shared Houses & HMOs in Park Street — questions

Does my Park Street HMO licence require special flooring paperwork?
Most Park Street licences require documented fire-rating for communal-area flooring. We include the certificate in every HMO fit — usable directly for licence renewal or new-licence application.
Do you handle Park Street HMO portfolios?
Yes — from 3 properties across the year. Fixed rate, batched material supply, coordinated scheduling around licence renewals and EPC/gas-safe visits. Portfolio saving typically 15–20% vs one-off pricing.
How long does a Park Street 6-bed HMO fit take?
5–7 working days for a full re-floor including all bedrooms, kitchen, communal areas and hallways. Room-by-room sequencing keeps some rooms usable throughout.
How do I protect the HMO Park Street floor between tenancies?
Silicone perimeter (no scotia to trap hair and dirt), commercial-grade wear layer, and a between-tenant cleaning protocol — pH-neutral cleaner, mop-and-dry only. We provide the protocol in the handover pack.
What warranty applies to a Park Street HMO flooring install?
10-year workmanship warranty (same as owner-occupied), plus manufacturer wear warranty (typically 20-year residential / 5-year commercial for LVT). Fire-rating certificate provided separately for licence purposes.
What fire rating do I need on my Park Street HMO floor?
Class B minimum for most Park Street HMO licences, Class Bfl-s1 for escape routes. Our default HMO spec is Class B-rated, with the certificate included in the quote pack for licence filing.

HMO flooring quote for Park Street

48-hour written quote, Class B fire certificate, portfolio pricing available.

HMOs in Park Street put concentrated wear on a smaller floor footprint than any other residential brief — commercial spec, fire compliance, and easy-clean detailing are non-negotiable.