How to prepare for fitting day

A well-prepared house takes a day off most flooring jobs and removes almost every reason a fitting overruns. Here is exactly what we need from you and what we take care of ourselves.

An emptied room prepared for flooring installation

Two weeks before: acclimatisation and access

We deliver material to site to acclimatise, usually five to seven days before fitting, so it needs a dry, heated space at normal living temperature — not a garage or a conservatory. Tell us about parking restrictions, permit zones, narrow access, lifts and any building management sign-in at this point rather than on the morning.

The week before: furniture and fittings

Rooms need to be empty. We can move heavy items as an agreed extra, but curtains, blinds down to floor level, valuables and anything breakable should be dealt with by you. Empty the bottom of wardrobes if they are staying in place, and lift anything stored under beds.

  • Take down floor-length curtains and blinds
  • Empty and, where possible, dismantle heavy furniture
  • Disconnect and pull out appliances if flooring goes beneath them
  • Clear a path from the front door to the room being fitted

Heating and underfloor heating

If you have wet underfloor heating, it must be commissioned and run through its full warm-up and cool-down cycle before fitting, then switched off 48 hours beforehand and brought back up slowly afterwards over several days. Getting this wrong is the single most common cause of gapping in a new wood floor. We will give you the schedule in writing.

Doors, skirting and thresholds

New flooring raises the floor level, so internal doors usually need trimming. Tell us at survey whether you want us to do it. Decide too whether skirting is coming off and going back on, or whether scotia beading will finish the perimeter — it changes the look and the price, and it is much easier to decide before the boards are down.

On the day

We arrive between 8 and 9am, protect the route in, and work with extraction running. Please keep pets and small children out of the working rooms — adhesives, trims and power tools make that non-negotiable. Water and a socket are all we need from you. We clear our waste, sweep down and walk the finished floor with you before we leave.

After we go

Stay off a newly finished wood floor for 24 hours, keep furniture off for 72, and leave rugs off for a week while the finish cures. Put felt pads under every chair and table leg before anything goes back. For glued floors, avoid washing the floor for the first fortnight.

Frequently asked

Can I stay in the house during fitting?
Yes, in most cases. We work room by room where we can, though a whole ground floor in one hit does make the house unusable for a day or two.
Will you move my furniture?
We can, as an agreed line on the quote. Pianos, safes and very large items may need a specialist.
Do you take away the old flooring?
Yes — uplift and disposal is quoted as its own line and included in the price you agree.
What if my subfloor turns out worse than expected?
We show you, photograph it and agree any additional work in writing before continuing. We do not do surprises on invoices.

In short

Empty the rooms, sort access and parking, run the underfloor heating cycle, decide on doors and skirting, and keep off the finish for the curing period. Everything else is ours to handle.

Book a fitting date that works around you

Free survey, fixed price, and a written preparation checklist before we start.

4.9

Trustpilot

210+

4.9

Google Reviews

140+

9.8/10

Checkatrade

Vetted

BOOK YOUR FREE SURVEY

READY TO
FIT YOUR DREAM FLOOR?

Our flooring experts are here to help. Book a free on-site survey and get a no-obligation quote within 48 hours.

Get Free Quote →